ICV – Installation, Commissioning & Verification Videos

KROHNE ICV Videos support you in handling KROHNE devices from unboxing to verification. The videos show you the exact procedure step by step.

The videos can be played on your PC, tablet or mobile phone so that you can access the video directly at a suitable place in the company.

H250 M40

Unboxing
Mechanical installation

Electrical Installation/Commissioning

Mechanical flow indication
MIN and MAX limit switches for flow monitoring
4…20mA / HART 7 for continuous flow measurement
Digital communication via Foundation Fieldbus or Profibus PA
4…20mA / HART 7 and totalizer via LCD and pulse output
Retrofit of modules

Verification

Mechanical Verification
Electrical Verification